Report_Id: 242005 Est NO 0001 |
Date:05/13/2024 |
COMMONWEALTH OF KENTUCKY
TRANSPORTATION CABINET
Contract ID | 242005 | Estimate Number | 0001 | Estimate Type | PROGRESS | ||
District Office | LOUISVILLE (05320) Moore, Jason A. | ||||||
Contractor | OGLESBY CONSTRUCTION INC | ADDR SN 0 VC Code KY0019149 | |||||
1600 TOLEDO RD RT 20 WEST | |||||||
PO BOX 380 | |||||||
NORWALK , OH , 44857 | |||||||
Pay Period | 02/22/2024 TO 04/18/2024 | ||||||
Date Approved | 04/30/2024 | ||||||
Primary Proj Number | MP12100002405 | ||||||
Project No. | FE01 121 DW24 005000 | ||||||
Primary County | VARIOUS | ||||||
Name of Road | VARIOUS ROUTES IN DISTRICT 5 | ||||||
Description | VARIOUS ROUTES IN DISTRICT 5 | ||||||
Date Let | 01/25/2024 | Formal Acceptance | |||||
Date Awarded | 02/06/2024 | Date Work Began | 04/13/2024 | ||||
Date Contract Executed | 02/22/2024 | Open To Traffic | |||||
Date NTP Issued | 02/22/2024 | Actual Completion Date | |||||
Current Contract Amount | $5,689,854.01 |
Total to Date |
Prev to Date |
This Estimate |
||
Original Amount | $5,689,854.01 |
Total Earnings | $102,722.91 |
$0.00 |
$102,722.91 |
|
Percent Complete | 1.81 |
Stockpiled Materials | $0.00 |
$0.00 |
$0.00 |
|
Funds Available | $5,587,131.10 |
Gross Earnings | $102,722.91 |
$0.00 |
$102,722.91 |
|
Total Change Orders | $0.00 |
Other Adjustments | $0.00 |
$0.00 |
$0.00 |
|
TOTAL | $102,722.91 |
$0.00 |
$102,722.91 |
|||
Contract Id | 242005 | Change Order Summary |
County | VARIOUS | ||||||
Estimate Nbr | 0001 | Project Number | FE01 121 DW24 005000 | |||||||
Contractor | OGLESBY CONSTRUCTION INC | Period | 02/22/2024 TO 04/18/2024 | |||||||
CHANGE ORDERS HISTORY | ||||||||||
CHANGE ORDER NBR | DESCRIPTION | STATUS | APPROVAL DATE | TOTAL CO AMOUNT | CONTRACT TIME ADJUSTED | |||||
CONTRACT ADJUSTMENTS HISTORY
Contract Adjustments |
|
|
Adjustment Description | Est No |
Adjustment Amount |
Line Item Adjustments History | |||||||||
PROJECT | ITEM NBR | DESCRPITION | TYPE | EST NO | ADJ QUANTITY |
UNIT PRICE |
ADJUSTED AMOUNT |
Contract Id | 242005 | COMMONWEALTH OF KENTUCKY |
County | VARIOUS | ||||||
Contract Type | TRWB WATERBOURNE PAINT STRIPING | TRANSPORTATION CABINET |
Primary Project Number | MP12100002405 | ||||||
Estimate Nbr | 0001 | Period | 02/22/2024 TO 04/18/2024 | |||||||
Contractor | OGLESBY CONSTRUCTION INC | |||||||||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | ||||||||
LINE ITEM NUMBER | ITEM DESCRIPTION | ITEM NO. | UNIT | PLAN QTY | CURRENT QUANTITY | QUANTITY PAID THIS EST | QUANTITY PAID PREV. EST | QUANTITY PAID TO DATE | UNIT PRICE | AMOUNT PAID THIS EST | AMOUNT PAID TO DATE | |
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0000 ROADWAY | |||||||
0005 | QUALITY CONTROL | 02572 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 60,000.00 | 0.00 | |||
0010 | MAINTAIN & CONTROL TRAFFIC | 02650 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 220,000.00 | 0.00 | |||
0015 | LAW ENFORCEMENT OFFICER | 20411ED | HOUR | 100.00 | 100.000 | 0.000 | 0.000 | 110.00 | 0.00 | |||
0020 | WATER BLASTING EXISTING STRIPE | 22664EN | LF | 500.00 | 500.000 | 0.000 | 0.000 | 10.00 | 0.00 | |||
0025 | RETROREFLECTOMETER DISTRICT 5 | 23138EN | EACH | 1.00 | 1.000 | 0.000 | 0.000 | 31,000.00 | 0.00 | |||
0200 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES VARIOUS 50% INITIAL | 06522 | MILE | 70.37 | 70.378 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0202 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES VARIOUS 50% FINAL | 06522 | MILE | 70.37 | 70.378 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0205 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES VARIOUS 50% INITIAL | 06523 | MILE | 63.51 | 63.513 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0207 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES VARIOUS 50% FINAL | 06523 | MILE | 63.51 | 63.513 | 0.000 | 0.000 | 497.50 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0015 BULLITT COUNTY RURAL SECONDARY ROUTES | |||||||
0030 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES BULLITT 50% INITIAL | 06520 | MILE | 49.32 | 49.320 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0032 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES BULLITT 50% FINAL | 06520 | MILE | 49.32 | 49.320 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0035 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES BULLITT 50% INITIAL | 06521 | MILE | 49.32 | 49.320 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0037 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES BULLITT 50% FINAL | 06521 | MILE | 49.32 | 49.320 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0040 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES BULLITT 50% INITIAL | 06522 | MILE | 6.84 | 6.846 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0042 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES BULLITT 50% FINAL | 06522 | MILE | 6.84 | 6.846 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0045 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES BULLITT 50% INITIAL | 06523 | MILE | 6.06 | 6.066 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0047 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES BULLITT 50% FINAL | 06523 | MILE | 6.06 | 6.066 | 0.000 | 0.000 | 497.50 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0037 FRANKLIN COUNTY RURAL SECONDARY ROTES | |||||||
0050 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES FRANKLIN 50% INITIAL | 06520 | MILE | 92.93 | 92.936 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0052 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES FRANKLIN 50% FINAL | 06520 | MILE | 92.93 | 92.936 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0055 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES FRANKLIN 50% INITIAL | 06521 | MILE | 111.18 | 111.181 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0057 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES FRANKLIN 50% FINAL | 06521 | MILE | 111.18 | 111.181 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0060 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES FRANKLIN 50% INITIAL | 06522 | MILE | 10.48 | 10.480 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0062 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES FRANKLIN 50% FINAL | 06522 | MILE | 10.48 | 10.480 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0065 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES FRANKLIN 50% INITIAL | 06523 | MILE | 13.89 | 13.890 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0067 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES FRANKLIN 50% FINAL | 06523 | MILE | 13.89 | 13.890 | 0.000 | 0.000 | 497.50 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0052 HENRY COUNTY RURAL SECONDARY ROUTES | |||||||
0070 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES HENRY 50% INITIAL | 06520 | MILE | 49.49 | 49.493 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0072 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES HENRY 50% FINAL | 06520 | MILE | 49.49 | 49.493 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0075 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES HENRY 50% INITIAL | 06521 | MILE | 157.92 | 157.926 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0077 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES HENRY 50% FINAL | 06521 | MILE | 157.92 | 157.926 | 0.000 | 0.000 | 320.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0056 JEFFERSON COUNTY RURAL SECONDARY ROUTES | |||||||
0080 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES JEFFERSON 50% INITIAL | 06520 | MILE | 80.72 | 80.728 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0082 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES JEFFERSON 50% FINAL | 06520 | MILE | 80.72 | 80.728 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0085 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES JEFFERSON 50% INITIAL | 06521 | MILE | 71.48 | 71.481 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0087 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES JEFFERSON 50% FINAL | 06521 | MILE | 71.48 | 71.481 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0090 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES JEFFERSON 50% INITIAL | 06522 | MILE | 29.91 | 29.912 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0092 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES JEFFERSON 50% FINAL | 06522 | MILE | 29.91 | 29.912 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0095 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES JEFFERSON 50% INITIAL | 06523 | MILE | 28.75 | 28.757 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0097 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES JEFFERSON 50% FINAL | 06523 | MILE | 28.75 | 28.757 | 0.000 | 0.000 | 497.50 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0093 OLDHAM RURAL SECONDARY ROUTES | |||||||
0100 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES OLDHAM 50% INITIAL | 06520 | MILE | 26.89 | 26.890 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0102 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES OLDHAM 50% FINAL | 06520 | MILE | 26.89 | 26.890 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0105 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES OLDHAM 50% INITIAL | 06521 | MILE | 68.92 | 68.927 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0107 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES OLDHAM 50% FINAL | 06521 | MILE | 68.92 | 68.927 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0110 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES OLDHAM 50% INITIAL | 06522 | MILE | 70.46 | 70.468 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0112 | PAVE STRIPING-WB PAINT-6 IN W RURAL SECONDARY ROUTES OLDHAM 50% FINAL | 06522 | MILE | 70.46 | 70.468 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0115 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES OLDHAM 50% INITIAL | 06523 | MILE | 63.24 | 63.244 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0117 | PAVE STRIPING-WB PAINT-6 IN Y RURAL SECONDARY ROUTES OLDHAM 50% FINAL | 06523 | MILE | 63.24 | 63.244 | 0.000 | 0.000 | 497.50 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0106 SHELBY COUNTY RURAL SECONDARY ROUTES | |||||||
0120 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES SHELBY 50% INITIAL | 06520 | MILE | 73.25 | 73.253 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0122 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES SHELBY 50% FINAL | 06520 | MILE | 73.25 | 73.253 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0125 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES SHELBY 50% INITIAL | 06521 | MILE | 66.78 | 66.786 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0127 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES SHELBY 50% FINAL | 06521 | MILE | 66.78 | 66.786 | 0.000 | 0.000 | 320.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0108 SPENCER COUNTY RURAL SECOMDARY ROUTES | |||||||
0130 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES SPENCER 50% INITIAL | 06520 | MILE | 37.92 | 37.920 | 32.907 | 0.000 | 32.907 | 292.50 | 9,625.29 | 9,625.29 | |
0132 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES SPENCER 50% FINAL | 06520 | MILE | 37.92 | 37.920 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0135 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES SPENCER 50% INITIAL | 06521 | MILE | 66.78 | 66.786 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0137 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES SPENCER 50% FINAL | 06521 | MILE | 66.78 | 66.786 | 0.000 | 0.000 | 320.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0112 TRIMBLE COUNTY RURAL SECONDARY ROUTES | |||||||
0140 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES TRIMBLE 50% INITIAL | 06520 | MILE | 20.79 | 20.790 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0142 | PAVE STRIPING-WB PAINT-4 IN W RURAL SECONDARY ROUTES TRIMBLE 50% FINAL | 06520 | MILE | 20.79 | 20.790 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0145 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES TRIMBLE 50% INITIAL | 06521 | MILE | 26.26 | 26.260 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0147 | PAVE STRIPING-WB PAINT-4 IN Y RURAL SECONDARY ROUTES TRIMBLE 50% FINAL | 06521 | MILE | 26.26 | 26.260 | 0.000 | 0.000 | 320.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0121 STATE PRIMARY, STATE SECONDARY, & SUPPLEMENTAL SYSTEMS ROUTE | |||||||
0150 | PAVE STRIPING-WB PAINT-4 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06520 | MILE | 96.88 | 96.886 | 19.739 | 0.000 | 19.739 | 292.50 | 5,773.65 | 5,773.65 | |
0152 | PAVE STRIPING-WB PAINT-4 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06520 | MILE | 96.88 | 96.886 | 0.000 | 0.000 | 292.50 | 0.00 | |||
0155 | PAVE STRIPING-WB PAINT-4 IN Y STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06521 | MILE | 104.72 | 104.726 | 2.699 | 0.000 | 2.699 | 320.00 | 863.68 | 863.68 | |
0157 | PAVE STRIPING-WB PAINT-4 IN Y STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06521 | MILE | 104.72 | 104.726 | 0.000 | 0.000 | 320.00 | 0.00 | |||
0160 | PAVE STRIPING-WB PAINT-6 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06522 | MILE | 1,352.74 | 1,352.745 | 93.818 | 0.000 | 93.818 | 450.00 | 42,218.10 | 42,218.10 | |
0162 | PAVE STRIPING-WB PAINT-6 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06522 | MILE | 1,352.74 | 1,352.745 | 0.000 | 0.000 | 450.00 | 0.00 | |||
0165 | PAVE STRIPING-WB PAINT-6 IN Y STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06523 | MILE | 1,230.71 | 1,230.711 | 87.831 | 0.000 | 87.831 | 497.50 | 43,695.92 | 43,695.92 | |
0167 | PAVE STRIPING-WB PAINT-6 IN Y STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06523 | MILE | 1,230.71 | 1,230.711 | 0.000 | 0.000 | 497.50 | 0.00 | |||
0170 | PAVE STRIPING-WB PAINT-12 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06526 | MILE | 18.04 | 18.046 | 0.437 | 0.000 | 0.437 | 1,250.00 | 546.25 | 546.25 | |
0172 | PAVE STRIPING-WB PAINT-12 IN W STATE PRIMARY, SECONDARY & SUPPLEMENTAL | 06526 | MILE | 18.04 | 18.046 | 0.000 | 0.000 | 1,250.00 | 0.00 | |||
0175 | DURABLE WATERBORNE MARKING-6 IN W INTERSTATE SYSTEM VARIOUS 50% INITIAL | 23140EN | MILE | 551.84 | 551.842 | 0.000 | 0.000 | 720.00 | 0.00 | |||
0177 | DURABLE WATERBORNE MARKING-6 IN W INTERSTATE SYSTEM VARIOUS 50% FINAL | 23140EN | MILE | 551.84 | 551.842 | 0.000 | 0.000 | 720.00 | 0.00 | |||
0180 | DURABLE WATERBORNE MARKING-6 IN Y INTERSTATE SYSTEM VARIOUS 50% INITIAL | 23141EN | MILE | 323.85 | 323.853 | 0.000 | 0.000 | 775.00 | 0.00 | |||
0182 | DURABLE WATERBORNE MARKING-6 IN Y INTERSTATE SYSTEM VARIOUS 50% FINAL | 23141EN | MILE | 323.85 | 323.853 | 0.000 | 0.000 | 775.00 | 0.00 | |||
0185 | DURABLE WATERBORNE MARKING-12 IN W INTERSTATE SYSTEM VARIOUS 50% INITIAL | 26162EC | MILE | 84.11 | 84.119 | 0.000 | 0.000 | 1,850.00 | 0.00 | |||
0187 | DURABLE WATERBORNE MARKING-12 IN W INTERSTATE SYSTEM VARIOUS 50% FINAL | 26162EC | MILE | 84.11 | 84.119 | 0.000 | 0.000 | 1,850.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0122 DEMOBILIZATION | |||||||
0190 | DEMOBILIZATION | 02569 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 90,000.00 | 0.00 | |||
Project | MP12100002405 | Fed/State Project Number | FE01 121 DW24 005000 | Category | 0125 ROADWAY | |||||||
0195 | RETROREFLECTOMETER DIVISION OF MATERIALS | 23138EN | EACH | 2.00 | 2.000 | 0.000 | 0.000 | 31,000.00 | 0.00 | |||
SUBTOT | $102,722.90 |
$102,722.90 |
||||||||||
LNNBR | STOCKPILE ADJUSTMENTS | UNIT |
ADJ. QUANTITY |
EST NBR |
UNIT PRICE | ADJUSTED AMOUNT |
||||||
SUBTOT | $0.00 |